1. Produttu Finituview
The GEYA GRT6-B2 is an electronic delay off time relay designed for industrial and domestic applications. It features adjustable delay settings and is suitable for DIN rail mounting. This manual provides essential information for safe installation, operation, and maintenance.
Funzioni chjave:
- Adjustable Delay: Delay can be set directly via panel knobs for convenience and intuitive control.
- Modi di funzione: Supports two primary functions: Delay ON (A) and Delay OFF (B). The GRT6-B2 model features 2SPDT (2NO2NC) contacts.
- Ampia gamma di tempu: Time scale from 0.1 seconds to 10 days, divided into 10 selectable ranges.
- Indicazione di Status: Equipped with LED indicators for power (green light) and working status (red light).
- Disegnu compactu: Ultra-small size, only 18mm width, designed for 35mm DIN rail mounting.

2. Informazioni di sicurezza
Please read this manual carefully before installation and operation. Failure to follow these instructions may result in equipment damage, injury, or death. This device should only be installed and serviced by qualified personnel.
- Always disconnect power before installing, wiring, or performing maintenance on the device.
- Assicuratevi chì tutti i cablaggi sianu conformi à i codici elettrici lucali è naziunali.
- Ùn aduprate micca l'apparechju s'ellu hè dannighjatu o malfunziona.
- Prutegge u dispusitivu da l'umidità, a polvera è e temperature estreme.
- Verificate u voltage and current ratings before connecting to a power source.
3. Product Dimensions and Components
The GRT6-B2 relay is designed for compact installation on a DIN rail. Understanding its dimensions and component layout is crucial for proper integration into your system.


4. Installazione è Wiring
The GEYA GRT6-B2 relay is designed for easy installation on a 35mm DIN rail. Follow these steps for secure mounting and correct electrical connections.
4.1 Montatura DIN Rail
The relay snaps onto a standard 35mm DIN rail. Ensure it is securely fastened to prevent movement during operation.
4.2 Cablaggio Elettricu
Refer to the wiring diagrams below for proper connection of the power supply and load. Always ensure power is disconnected before wiring.

4.3 Power Connection Demonstration
Watch this video for a visual guide on connecting power and load to the GRT6-B1 model, which shares similar wiring principles with the GRT6-B2.
5. Operating Instructions
The GRT6-B2 relay offers adjustable delay functions. Follow these steps to configure and operate your device.
5.1 Modi di funzione
The GRT6-B2 supports two main function modes:
- A: Delay ON: The output contacts close after a set delay time once power is applied.
- B: Delay OFF: The output contacts open after a set delay time once the trigger signal is removed or power is disconnected.

5.2 Impostazione di u tempu
The delay time is set using two rotary knobs on the front panel: one for time range and one for percentage.

5.3 Indicatori LED
- LED verde: Indicates power supply status.
- LED rossu: Indicates the working status of the relay (e.g., timing in progress, output active).
6. Mantenimentu
The GEYA GRT6-B2 time relay is designed for reliable operation with minimal maintenance. However, periodic checks can help ensure its longevity and proper function.
- Pulizia: Keep the device clean and free from dust and debris. Use a dry, soft cloth for cleaning. Do not use liquid cleaners.
- Ispezione: Periodically inspect wiring connections to ensure they are secure and free from corrosion. Check for any signs of physical damage or overheating.
- Ambiente: Assicuratevi chì l'ambiente operativu resti in i limiti di temperatura è umidità specificati per impedisce guasti prematuri.
7. Risoluzione di prublemi
If the GEYA GRT6-B2 relay is not functioning as expected, consider the following common issues:
- Nisuna indicazione di putenza (LED verde spento): Verificate i cunnessione di l'alimentazione (A1, A2) è assicuratevi chì u vulumetage is within the specified range (AC/DC 24V-240V).
- Relay Not Activating/Deactivating:
- Verify the function mode (A or B) is correctly selected.
- Check the time range and percentage paràmetri.
- Ensure the trigger signal (S) is correctly applied for Delay OFF functions.
- Inspect load connections and ensure the load is functioning correctly.
- Timing incorrettu: Re-check the time range and percentage settings. Ensure the knobs are firmly set to the desired values.
- Surriscaldamentu: If the device feels excessively hot, check the load current to ensure it does not exceed the relay's maximum rating (10A/AC1).
If problems persist after checking these points, contact a qualified electrician or the manufacturer for assistance.
8. Specificazioni
Detailed technical specifications for the GEYA GRT6-B2 time relay.

| Parametru | Valore |
|---|---|
| Marca | GEYA |
| Mudellu | GRT6-B2 |
| Funzione | Delay ON (A), Delay OFF (B) |
| Terminali di furnimentu | A1-A2 |
| Voltage Gamma | AC/DC 24V-240V (50-60Hz) |
| Input di putenza | AC max. 6VA/1.9W |
| Intervalli di tempu | 0.1s - 10 days (ON, OFF) |
| Impostazione di u tempu | Potenziometru |
| Output | 2xSPDT (2NO2NC) |
| Valutazione attuale | 10A / AC1 |
| Switching Voltage | 250VAC/24VDC |
| Temperature di funziunamentu | -20 °C à +55 °C (-4 °F à 131 °F) |
| Temperature di almacenamiento | -35 °C à +75 °C (-22 °F à 158 °F) |
| Muntà | Guida DIN EN/IEC 60715 |
| Dimensioni (L x W x H) | 64 mm x 18 mm x 95 mm (circa) |
| Pesu | Circa. 2.08 once |
9. Garanzia è Support
For warranty information, please refer to the documentation provided with your purchase or contact your seller. If you require technical support or have questions regarding the GEYA GRT6-B2 time relay, please reach out to the manufacturer or authorized distributor.





